FOR A FREE CONSULTATION CALL (972) 317-3500

Your Dream Pool Experience

New Pool
Construction

Simply stated, Outdoor Living pool designers create beautiful pools built on your ideas. Our experts will listen to your desires and expectations. In exchange, they will share their insights and experience with you. From your initial consultation to design, construction and project management, we are completely committed to making your pool building experience an easy one.

We make it easy.

Our Process

Outdoor Living Pool & Patio is dedicated to making your pool building experience as seamless as possible. While every custom built pool is different, the design and building process generally remains the same. Know what you can expect after you contact Outdoor Living to build your custom pool in DFW.

01. Initial Consultation

One of our expert designers will visit you at your home, where we will listen carefully so that we can seamlessly translate your vision into an elegant and functional backyard oasis. Within two weeks, your custom design will be completed and ready for review.

02. Schedule New Pool Build

We will immediately begin to schedule the building phase of your new pool. As we go through the permitting process, our representatives will schedule a “pre-construction meeting” with you so that you know exactly what to expect over the next couple of months.

0.3 Building your custom pool

We will begin to engineer your custom pool with meticulous detail. We will start by grading and excavating the site, and will perform any necessary demolition during this phase. After the site has been excavated, we will install the reinforcing steel (rebar). Plumbing and electrical work will then be completed before the pool goes through an initial inspection.

0.4 Gunite Application

Your pool will be sprayed with a concrete-like substance known as gunite. This usually takes between one and two weeks to cure. After the gunite has cured, we will install the coping and tile.

05. Masonry

We will complete all of the masonry work. If you have chosen to include features like custom walls, rock features, waterfalls, a grill or a fireplace, they will be built or installed during this phase of construction.

06. Decking

The deck of your pool will be installed.
It usually takes two days to prepare the deck and one week to install the decking. Then your pool will go through another inspection. Any options such as gates, fences, or alarms will also be installed here.

0.7 Plastering

Finally, your pool will be plastered. This is one of the last phases of construction. It will usually only take one day to plaster your pool.

0.8 Enjoy Your New Custom Pool!

Fill your new pool with water! When the plaster phase is complete, your pool will finally be ready to be filled with water. Now it’s time to call your friends and family so you can have a pool party to celebrate!

01. Initial Consultation

One of our expert designers will visit you at your home, where we will listen carefully so that we can seamlessly translate your vision into an elegant and functional backyard oasis. Within two weeks, your custom design will be completed and ready for review.

02. Schedule New Pool Build

We will immediately begin to schedule the building phase of your new pool. As we go through the permitting process, our representatives will schedule a “pre-construction meeting” with you so that you know exactly what to expect over the next couple of months.

0.3 Building your custom pool

We will begin to engineer your custom pool with meticulous detail. We will start by grading and excavating the site, and will perform any necessary demolition during this phase. After the site has been excavated, we will install the reinforcing steel (rebar). Plumbing and electrical work will then be completed before the pool goes through an initial inspection.

0.4 Gunite Application

Your pool will be sprayed with a concrete-like substance known as gunite. This usually takes between one and two weeks to cure. After the gunite has cured, we will install the coping and tile.

05. Masonry

We will complete all of the masonry work. If you have chosen to include features like custom walls, rock features, waterfalls, a grill or a fireplace, they will be built or installed during this phase of construction.

06. Decking

The deck of your pool will be installed.
It usually takes two days to prepare the deck and one week to install the decking. Then your pool will go through another inspection. Any options such as gates, fences, or alarms will also be installed here.

0.7 Plastering

Finally, your pool will be plastered. This is one of the last phases of construction. It will usually only take one day to plaster your pool.

0.8 Enjoy Your New Custom Pool!

Fill your new pool with water! When the plaster phase is complete, your pool will finally be ready to be filled with water. Now it’s time to call your friends and family so you can have a pool party to celebrate!

Outdoor Living Pool & Patio is a premier custom pool builder in Denton and surrounding areas. Contact us to bring your backyard oasis to life.

MEET OUTDOOR LIVING

NEED HELP?

FOLLOW US